To the central content area

Enhanced Business and Sewage Sewer Systems Permit and Reporting Management Program

Absrtact
The project has been completed and the results are provided. Regarding the improvement of the management of bypass discharge, we propose the key measures such as " Provisional Storage and Recycling Management" and "Concealed Pipe Inspection and Prevention of Recurrence Management." It also reviewed current practice management issues. We drafted 4 regulatory revisions to the permit management regulations, water measures management regulations, by-laws, and penalty criteria, and proposed amendments to the permit (document) application form. We completed checklist filtering and 1 exchange session. We complete the analysis of differences in environmental permit requirements for air, water, waste, and toxics. Establish the framework of environmental permit application review management methods, integration of the application conditions, application for delivery and receipt, documents and procedures, validity period, review principles, methods and periods, correction period, registration matters, issuance of permits, revocation or revocation and permit issuance and extension of the validity period and other provisions proposed draft articles. Completed the study and drafting of the "Operating Principles for Integrated Consultation and Review Procedures for Environmental Protection Permits" and assisted in the implementation of subsequent supporting operations, including the establishment of a single window and consultation and review mechanism for the issuing authority and related question and answer sets, and consultation services to study and assist in the promotion of single-window permit processing and consultation and review operation processes. Furthermore, we continue to support the EPA in the integration of air, water, waste, and toxics permit records, adjusting the functions of the system, as well as interfacing with industrial management units to track and control unregistered factories and provide tracking results at the beginning of each month. To complete the planning of the 2021 abnormality analysis and diagnosis check project, the proposed list of abnormality analysis and diagnosis check projects and the proposed check order for the consideration of the environmental protection authorities in each county and city. Complete the online operation of the control data management system and the tracking mechanism for the verification of compliance with regulations. Cooperate with the system revision operation for related support; continuously strengthen the information security operation and cooperate with the Supervisory Information Office to maintain the host settings. Meanwhile, the project implementation team has cooperated with the EPA to discuss and assist in administrative matters regarding the various tasks of the project and to analyze data and provide statistical reports monthly for each control project. Finally, we completed the compilation of the 2020 Green National Income Account, 5 bi-monthly e-newsletters, established the "Water Pollution Regulation Knowledge Plus" LINE community, 3 promotional postings, and a sample guidebook on important water pollution prevention regulations for industries, and held a water pollution prevention workshop.
Keyword
Industry Wastewater, Permit Management, Database Management
Open
top